Floor by Floor remodel of Sutter General Hospital (now Ose Adams Medical Pavilion) to integrate existing hospital with the new Women’s and Children’s Center. CYA worked about three dozen small projects over the course of two years to update Sutter General Hospital’s medical gas system and connect it to the new source systems in the Women’s and Children’s Center. CYA performed medical gas system verification testing on the oxygen, medical air, vacuum, nitrogen, nitrous oxide, and WAGD systems. Testing of work that included the removal of medical gas systems from certain areas of the hospital, relocation of zone valves and area alarm panels, installation of new medical gas system equipment, relocation of mainlines, and connection to new mainlines.