CYA performed ASSE 6030 Verification Testing of the new Rehabilitation Building. This included connecting a new master alarm system to the existing master alarm panels in the main Hospital and CUP.
The new 174,000 sq. ft. Rehabilitation Center consolidates outpatient and inpatient rehabilitation programs, including a 24-bed Polytrauma Rehabilitation center, a 12 bed Polytrauma Transitional Rehabilitation program, a 32 bed Blind Rehabilitation center, Physical Medicine Rehab, Physical Therapy, and Occupational Therapy.
The new medical gas system included a Bulk Oxygen Tank, new medical air compressor system, and new vacuum pump assembly dedicated to the new building.